Bright People. Right Solutions.

Creek Line Revegetation and Weed Control

  • Creek Line Revegetation and Weed Control
  • Creek Line Revegetation and Weed Control
  • Creek Line Revegetation and Weed Control

As part of the development approval, Kleinfelder was engaged to undertake creek line jute matting, revegetation, and weed control along a section that was cleared by the developer and required revegetation. The creek line was reshaped, with installation of jute matting (880m2) and approximately 3,000 native plants.


Preventing the Jute Matting from Being Pushed Down

The creek line was at the base of a catchment and, during rainstorm events, a large volume of water would flow through the creek. The major challenge of this project isto ensure successful establishment of the plants in a highly disturbed environment.

An Innovative Resolution

To remedy this problem, Kleinfelder undertakes regular maintenance, removing weeds and rubbish that impacts the creek line.

Project Results

As part of the work, the creek banks were stabilized with the rock and jute matting, and the creek line was fully revegetated with native plants, versus unsightly concrete. This enabled our client to achieve their consent approval and proceed with development, while also receiving its monetary deposits back. Furthermore, Kleinfelder has a two-year maintenance program to maintain the creek line, helping our client maintain its positive relationship with regulatory authorities and the community.

Project Details

Location:
Tenambit, New South Wales

Owner:
Woodburys Earthmoving and Haulage

Share:
Skip to content